Standpipe & Hose Systems

Code-sized standpipes, hose cabinets, and Fire Department Connections.

Suppression

In multi-story or large-footprint buildings, a standpipe system gives firefighters and trained occupants reliable water access exactly where it is needed, not three floors and a long hose run away from the fire. ALNADA Contracting installs Class I, II, and III standpipe systems, hose cabinets, and Fire Department Connections placed and sized according to code.

Why Standpipe Systems Matter

In a multi-story fire, every minute spent running hose lines up stairwells is a minute the fire has to spread further. A correctly designed and placed standpipe system eliminates that delay, giving responders immediate access to pressurized water on the floor where it is actually needed. For buildings tall enough or large enough that hand-carried hose from ground level is not practical, a standpipe system is not an optional upgrade. It is the only way emergency response can realistically reach the affected floor in time.

Standpipe & Hose Systems project photo

Types of Standpipe Systems We Install

  • Class I standpipes: 2.5-inch hose connections intended for fire department use, delivering the flow professional firefighting crews require
  • Class II standpipes: 1.5-inch hose stations designed for use by trained building occupants before fire services arrive
  • Class III standpipes: combining both connection types, for buildings where code requires dual capability
  • Wet riser systems: permanently charged with water, ready for immediate use
  • Dry riser systems: charged with water only when needed, used where freezing risk or code requirements call for it

Installation & Maintenance Excellence

Our installations include hose cabinets, reels, landing valves, and hose valve assemblies, with Fire Department Connections positioned for genuinely fast external access, not simply wherever is most convenient on the building’s exterior wall. Every outlet is flow- and pressure-tested at commissioning to confirm it delivers what the design calls for at every floor, not just at the point closest to the pump.

Standpipe & Hose Systems installation photo

NFPA 14

  • Class I standpipes
  • Class II standpipes
  • Class III standpipes

Compliance

Designed and installed to NFPA 14, which governs standpipe and hose system classification, sizing, and placement.

Why choose ALNADA Contracting

  • We size Class selection to your building’s actual occupancy type and height rather than defaulting to the minimum code allows, and we plan FDC placement around how fire crews will realistically approach your building, informed by 10 years of projects across facilities of varying height and layout

Talk to a fire-protection engineer

Send a quote request during working hours (Sat-Thu, 9:00 AM-4:00 PM), and an ALNADA Contracting engineer will call you back.

Annual Maintenance Contract (AMC) cover includes inspections and full Civil Defense compliance.